Nine sessions.
No pitch.
Wendell teaches the work: how to underwrite a deal, how to read a pro forma, what kills a lot before you ever break ground, and what to ask any sponsor before you wire a dollar. Including us.
Free, and education only. We would rather you knew how to check our numbers than took our word for them.
Open any one.
01 Find Your Freedom Number Your Freedom Number is how much you would need invested for its income to replace your paycheck. The math, and an honest look at where those returns actually come from. +
Most people can name their salary. Almost nobody can name the number that replaces it.
It is one line of arithmetic and it takes ninety seconds. The hard part is being honest about the yield you plug into it, because that single assumption decides whether your plan takes eleven years or thirty.
- Monthly number × 12 ÷ yield. At $6,000 a month that is $1.03M at 7%, or $600K at 12%.
- You never experience the average: one of the last twenty-one years landed inside the 8–12% band.
- Advertised targets sit several points above what private real estate has actually delivered.
- The lever you control is the contribution, not the return.
02 7 Questions to Ask Any Sponsor Before you wire a dollar. Including to us. +
You are not investing in a building. You are investing in a person’s judgment.
The gap between a good operator and a bad one, in the same market and the same year, is enormous. So the diligence that matters most is not on the property.
- Ask for the full track record, losses included, and a reference from a deal that went badly.
- “Is your co-investment already in your account, or is it your acquisition fee rolled in?”
- “One percent of what?” The base is where fees hide.
- Read the waterfall in the downside case, and ask whether there is a catch-up.
- If the pitch deck and the operating agreement disagree, walk.
03 Reading a Pro Forma Like an Operator The five load-bearing numbers, and the three places optimism hides. +
A pro forma is not a forecast. It is an argument.
The arithmetic is almost always right. Your job is to find the two or three assumptions everything else rests on, and ask what happens when those are wrong.
- Six buckets. Give soft costs and disposition their own lines or they go missing.
- Contingency should define the spread between best, base and worst, not sit as a pad at the bottom.
- Check five things: the exit assumption, the timeline, the build budget, the debt terms, the contingency.
- Optimism hides in comps, in the word “allowance,” and in exit timing.
- Before you add your own buffer, ask what is already buffered. Otherwise you are counting the same cushion twice.
04 A Deal That Dies in Diligence Is Cheap How we underwrite, and two we did not buy. +
The deals we are proudest of include several we never bought.
Diligence has one job: turn unknowns into either numbers or reasons to stop, before your money is committed. A deal that dies in diligence costs an inspection fee and a weekend. The same deal found after closing costs a year.
- Conservatism has a direction: reduce features, default to the low end, consistently.
- State every assumption in the offer, so a wrong one is a renegotiation and not an argument.
- Silence does not equal approval.
- Stegall Street: we walked, and moved the build to Sarah Drive. Rock Hill: found it in diligence and re-traded.
- Screen cheap first, confirm what is buildable, comps before price, model three cases.
05 The Powerline That Rewrote the Pro Forma Five deal-killers, what each one costs, and exactly where to check it for free. +
Every one of these is free to check, and every one of them has ended a deal.
None of the five is exotic and all of them are public record. What makes them dangerous is that they are invisible from the street and absent from the listing, so the only people who find them are the people who look.
- Utilities: near a main is not connected. Pull the current fee schedule for the actual jurisdiction.
- Soils: a septic lot is workable when it has perked, not when you hope it will.
- Access: legal frontage, or it is not a lot. Easement buffers erase buildability.
- Flood takes thirty seconds. The post-construction stream buffer is the one that hides.
- Entitlement is a timing risk, and timing is what kills leveraged deals.
06 Debt vs. Equity: Two Seats at the Same Table Where each one sits, what each one is owed, and how sponsors align themselves with you. Or do not. +
The same project can pay you two completely different ways. Neither is better. They are different jobs.
Debt gets paid first, is owed a contractual number, and stops there. Equity gets paid last, gets what is left, and has no ceiling. Most arguments about which is better are really arguments about what the money is for.
- The trade is certainty for upside, not safe for risky. Both can lose.
- A preferred return is a queue position, not a yield. On what base, and does it compound?
- The catch-up never makes the headline, and it can make an 80/20 pay you less than a 70/30.
- Deferred fees are the strongest alignment signal available. Ask which are subordinated.
- Match the seat to the job of the money, then read the operating agreement rather than the deck.
07 Deal Breakdown: 6900 Barrington Drive One project, line by line, including a number we had been quoting wrong. +
Receipts instead of theory.
One completed ground-up build in Charlotte. Where the money went, what it sold for, how long it actually took, and what we would do differently.
- About $256,000 in land, build and soft costs, a $384,900 sale and about $129,000 gross profit before financing, holding and selling costs (about $87,000 net after them). One project, historical, not typical.
- Proceeds are not profit. $127,000 hit the account, and most of it was our own capital back.
- Soft costs were $29,000, and $18,000 of that was water and sewer taps on one lot.
- We had been quoting 319 days. Traced to the documents on this build it is 237 days from building permit to sale, 142 of them from slab to certificate of occupancy.
- We paid an early-completion bonus on a job our own contract says was late. We did not read our own contract.
08 Why Charlotte: The Growth Math Five years of data, where the people are coming from, and the parts that argue against us. +
“People are moving there” is not a thesis. It is a rumour with good PR.
A market thesis needs demand you can measure, supply that cannot easily respond, and a reason to believe both persist. We run Charlotte through that test, including the numbers that have turned against the story.
- The metro added about 270,000 people in five years, and ranked first nationally for net domestic migration in 2024 and 2025.
- The 2025 slowdown was entirely international. Domestic migration went up.
- Permits fell 26% over five years while population rose. Supply is structurally slow.
- But prices are flat in 2026 and supply is at 3.7 months. Execution matters now.
- If you cannot state the strongest argument against your own thesis, you do not understand it.
09 How a Syndication Actually Works The structure, the paperwork, the tax forms and the failure modes. Before anybody shows you a deal. +
Every other session assumes you already know what this thing is. This one fixes that.
A syndication is a group of people buying one asset through one company, where a few people run it and everybody else supplies capital and waits. That sentence hides a lot of machinery.
- You are buying a security: a slice of a company that owns the project.
- Read the operating agreement, not just the PPM. The agreement is what binds.
- Expect your K-1 between March and September. Depreciation is deferral, not forgiveness.
- Find the words “capital call” and “default” before you wire.
- An exemption is not a shield, and Form D is not approval. Check EDGAR yourself.
Come to the next one live.
Each session runs live once enough people sign up. Join the waitlist for any session above and you will get the invitation and the replay.
Education only. Nothing in these sessions or on this page is an offer to sell or a solicitation of an offer to buy any security, or investment, legal or tax advice. Historical figures are historical and are not a guarantee or projection of future results. Third-party data is cited to its source and was current as of August 2026. Tide & Timber Investments · Charlotte, NC